The Public Works Department is located in Vlasis Park at 200 Park Drive. The maintenance work hours for the Public Works Department are 7:00 a.m. – 3:30 p.m. Monday – Friday. Snow plowing, street and sign maintenance, leaf collection, mosquito fogging, street sweeping, sidewalk repair, engineering, and fleet maintenance are provided as basic services.


2013 CONTRACTUAL STREET IMPROVEMENT SCHEDULE

Updated: 5/13/13 

City of Ballwin has awarded a contract to remove and replace deficient concrete pavement on Twigwood (New Ballwin-Ballwood), St. Joseph, Treasure Cove and Seven Trails. (Phase 1) Camargo/Golfview, Glen Meadow (Phase 2).   The Public Works Department will oversee the work. The City’s contractor, M & H Construction Co., will perform the work, which is scheduled to begin work during the week of April 2, 2013 weather permitting.  The following schedule will be updated periodically. 

 

Tentative Start Dates

Asphalt Removal

Slab Replacement

Sidewalk Replacement

New Asphalt Overlay

Phase1

 

 

 

 

Twigwood (New Ballwin-Ballwood)

Complete

In Progress

TBD

June/July

St. Joseph

Complete

May 13

N/A

June/July

Treasure Cove

Complete

Complete 

N/A

June/July

Seven Trails

Complete

Complete

N/A

June/July

Phase 2

 

 

 

 

Camargo/Golfview

Complete

May 13

TBD

June/July

Glen Meadows

Complete

TBD

TBD

June/July

Iron Lantern

None

Complete

TBD

None

The first task was removal of the old deteriorated asphalt overlay followed by replacement of selected concrete pavement.   Parking will be restricted and access to your driveway may be affected.  Signs will be posted with no parking date and times.  The new asphalt overlay will be completed by N.B. West Construction after the street and sidewalk replacement is complete. 

Unfortunately, the complexity of the construction combined with the unpredictable weather in the St. Louis region will dictate the length of time needed to complete the work. The contractor’s work force concentrates its effort in one or more locations at a time. Consequently, there may be times when there will be no work in a specific area as a result of normal construction phasing.  Motorists should expect delays. 

Questions should be directed to Construction Inspector Joe Gregor or City Engineer Gary Kramer at 636-227-9000.   If there is an emergency outside of normal working hours, you may contact the Ballwin Police Dispatcher at 636-527-9200. 

We appreciate you patience and heightened defensive driving effort during the project. Please remember, construction areas can be dangerous. If you have children, remind them to stay away from the work areas at all times.

Ballwin Public Works Department

City of Ballwin, 14811 Manchester Road, Ballwin, Missouri 63011
(636) 227-8580 (Voice) (636) 527-9200 (TDD) (800) 735-2966 (Relay Missouri)
(636) 207-2300 (24 Hour Information line)
Email Webmaster
Copyright ©1999-2013 City of Ballwin, Missouri, U.S. All Rights Reserved.
Shipping PolicyRefund PolicyPrivacy PolicyDisclaimerFair Housing Statement